Sunday, December 27, 2009












More pictures finally of the pub, dining area, our master bedroom with our new king size bed, and the movie theater room. Hope everyone had a Merry Christmas and thanks to all of our friends and family who have made this house a possibility.

Tuesday, September 22, 2009

Thursday, September 17, 2009

Moving in soon hopefully!

Working on finishing up the siding.

The back porch starting to go up.
The pub after being taped and mudded.

The view as you drive up.
The front porch almost done.
The back porch, will be screened in completely.
The cooktop finally arrived and wasn't broken this time, YEAH!
The new fridge and appliances.
The pub dog wash shower.
The pub after the first coat of green and lights installed.

Tuesday, September 1, 2009

Bathroom, Floors, Its Electric

They installed our under the cabinet lighting yesterday....
And our light and ceiling fan in the dining room...
Lights in the Kitchen.... And they installed the lights in the theater room and started wiring the pub (pictures coming soon).


Master Bath- they installed the double doors and the floor is almost done.
This is our shower in the master bath.
Doors into bathroom from Master Bedroom the two doors to either side are our Walk-In-Closets.

The master bathroom floor is almost finished and looks really nice. It is kind of hard to see the texture of the tiles. The super shower sprayer is in the tub!

Thursday, August 27, 2009

FLOORS!


We have basement windows now- and they have starting putting siding up on the ends of the house.
The idea for the bar in the pub.

They started on the front porch, all of the boards will be hammered by hand and they use copper flashing against the house.















Installed the Kitchen & Laundry room floor today- it looks great, will take a close up of the Kitchen when we can walk on it.







































View from the master bath.



























Countertops were installed yesterday, look really good. Today they dropped the sink in, will get a picture of that tomorrow.

Tuesday, August 25, 2009

Progress...


Last week the slab was finally poured, (the day it was suppose to be poured the people never showed up so we got a different company to come out the next day.) there were quite a few uneven spots at first, but after they cut the slab for expansion and contraction there is only one spot that is still uneven that they have to come back and fix.







The pattern for the dog shower downstairs in the pub basement. We have just enough tile so keep your fingers crossed for us.















They have already framed the upstairs and sheet rocked, there will be a door at the top of the stairs (on the right of this picture).









The stairs leading to the attic.
























The basement up to the main floor.


















This is the master bath and our shower pattern laid out on the floor. There will eventually be two glass french doors right where the fan is, the shower is to the right.









No more holes in the ceiling- they repaired the drywall where the house came in two parts.



This is the layout for the upstairs guest bathroom floor, we had a whole box of tile break and this was the only way I could make it work with 1 tile to spare (the ones that broke will have to be cut to fill in the triangles.
















The view from the pub door to the left.











































I finally got to walk up the stairs for the first time today instead of a ladder- that was a great improvement. The basement bathroom was framed in yesterday.