Tuesday, September 22, 2009

Thursday, September 17, 2009

Moving in soon hopefully!

Working on finishing up the siding.

The back porch starting to go up.
The pub after being taped and mudded.

The view as you drive up.
The front porch almost done.
The back porch, will be screened in completely.
The cooktop finally arrived and wasn't broken this time, YEAH!
The new fridge and appliances.
The pub dog wash shower.
The pub after the first coat of green and lights installed.

Tuesday, September 1, 2009

Bathroom, Floors, Its Electric

They installed our under the cabinet lighting yesterday....
And our light and ceiling fan in the dining room...
Lights in the Kitchen.... And they installed the lights in the theater room and started wiring the pub (pictures coming soon).


Master Bath- they installed the double doors and the floor is almost done.
This is our shower in the master bath.
Doors into bathroom from Master Bedroom the two doors to either side are our Walk-In-Closets.

The master bathroom floor is almost finished and looks really nice. It is kind of hard to see the texture of the tiles. The super shower sprayer is in the tub!